SANTOMAS BAC NINH FACTORY PROJECT

Project Introduce

Civil Work: Metal sheet with insulation form elevation fl+0.3 up to the roof level. Deck plate for 2st floor. Metal roof sheet with insulation for boundary wall. Utility with loading yard & dock leveler system. Utility system is included

M&E Work: Semi cleaning room at tooling area, production area with AHU system. Compressor, clean water…. system including.

Investor Santomas Vietnam JSC.
Project scale 6,200 M2
Commencement date 30/11/2016
Finishing day 04/06/2017
SANTOMAS BAC NINH FACTORY PROJECT

Project Location

Civil Work: Metal sheet with insulation form elevation fl+0.3 up to the roof level. Deck plate for 2st floor. Metal roof sheet with insulation for boundary wall. Utility with loading yard & dock leveler system. Utility system is included

M&E Work: Semi cleaning room at tooling area, production area with AHU system. Compressor, clean water…. system including.

Project Images

6
5
4
7

Contact

    Images
    Messenger Zalo Tel Back to top